Date: July, 06, 2008
Original page:
Main recent references in Refining and Petrochemical Processes
Expand all
Customers
OMV In progress
Customer: OMV
Field / Site location: Schwechat, Austria
Simulation Scope: OTS
Liquid Cracking Plant (Linde)
Control System: Honeywell TDC3000 emulation
Comments / Benefits: Certification program for operator training
Delivery date: In progress
Petrochemical Corporation of Singapore (PCS) In progress
Customer: Petrochemical Corporation of Singapore (PCS)
Field / Site location: Jurong Island, Singapore
Simulation Scope: OTS
Liquid Cracking Plant(Stone and Webster)
Control System: Honeywell TPS TDC3000 (Link)
Comments / Benefits: Certification program for operator training
Delivery date: In progress
BASF In progress
Customer: BASF
Field / Site location: Antwerp, Belgium
Simulation Scope: OTS
Naphtha Cracking Plant (Linde and ABB Lummus)
Control System: Honeywell TPS TDC3000 (Link)
Comments / Benefits: Certification program for operator training
Delivery date: In progress
Marun PC 2006
Customer: Marun PC
Field / Site location: Iran
Simulation Scope: OTS
Ethane - Propane steam-cracker (Linde)
Control System: Yokogawa CS3000 (Emulation)
Comments / Benefits: Certification program for operator training
Delivery date: In progress
PETRONAS - EMSB 2005
Customer: PETRONAS
Field / Site location: Malaysia
Simulation Scope: OTS
Propane & Naphtha steam cracker (ABB Lummus)
Control System: Honeywell TDC3000 emulation
Comments / Benefits: Operator training
Delivery date: 2005
TOTAL 2005
Customer: TOTAL
Field / Site location: Donges Refinery, France
Simulation Scope: OTS
Utility Boiler simulator:Steam and fuel gas networks of boilers
Control System: Honeywell TDC3000 emulation
Comments / Benefits: Operator training
Delivery date: 2005
BP 2005
Customer: BP
Field / Site location: Cherry Point Refinery, USA
Simulation Scope: OTS
CDU/VDU
Control System: Honeywell TPS GUS (Link)
Comments / Benefits: Operator training
Delivery date: 2005
TOTAL 2004
Customer: TOTAL
Field / Site location: TOTAL refinery
Simulation Scope: OTS
Blending
unit involved in manufacturing of gasolines, gas oil and fuel oils.
Last stage before products leave the refinery. The simulator may work
stand-alone or connected to an optimization tool.
Control System: RSI SIMCON proprietary.Communication via OPC with the optimization tool
Comments / Benefits: Operator training and optimization tool
Delivery date: 2004
OMV 2004
Customer: OMV
Field / Site location: Burghausen, Germany
Simulation Scope: OTS
Naphtha steam-cracker (Combination of process licensors)
Control System: Honeywell TPS TDC3000(Link)
Comments / Benefits: Operator training for new operators
Delivery date: 2004
Rio Polimeros 2004
Customer: Rio Polimeros
Field / Site location: Brazil
Simulation Scope: OTS
Ethane-Propane (ABB Lummus)
Control System: ABB Advant MOD300 (Link)
Comments / Benefits: perator training before start-up
Delivery date: 2004
TOTAL 2004
Customer: TOTAL
Field / Site location: Donges refinery, France
Simulation Scope: OTS
Highly integrated distillation unit. Crude Switch Model.
Control System: Honeywell TDC3000 emulation
Comments / Benefits: Operator training and Engineering purposes
Delivery date: 2004
TOYO ENGINEERING CORPORATION 2004
Customer: TOYO ENGINEERING CORPORATION
Field / Site location: Bandar Assalouyeh - Fourth Aromatic Plant
Simulation Scope: OTS
The Plant has been split in 7 simulators:
Hydrogenation of pyrolysis gasoline
Prefractionation and Hydrotreatment of gas condensates
Continuous Catalytic Reforming
Separation of Reformate and Aromatics
Extraction of Benzene and Toluene (Krupp Uhde )
Disproportination and Transalkylation Units (Toray)
Xylenes isomerization
Control System: Emulation of YOKOGAWA CS3000 DCS
Comments / Benefits: Huge Simulator modelling the whole Plant.Use of the simulator for initial training of plant operators before refinery start up.
Delivery date: 2004
Petrochemical Unit 2004
Customer: Petrochemical Unit
Field / Site location: New 1-butene Unit
Simulation Scope: OTS
Ethylene dimerization by a liquid-phase process using a soluble catalyst system
Control System: Emulation of YOKOGAWA CS3000 DCS
Comments / Benefits: Providing engineers and operators
with experience prior to commissioning. Startup and shutdown
procedures. Unlimited variety of what if situations. Dynamics of heat
exchanger fouling due to oligomer formation. Operation of distillation
columns to ensure polymer-garde product specification. Emergency
situation, fire case.
Delivery date: 2004
Syncrude Canada Limited 2004
Customer: Syncrude Canada Limited
Field / Site location: Canada
Simulation Scope: OTS
LC Fining
Control System: Honeywell TDC3000 (Link)
Comments / Benefits: Operator training
Delivery date: 2004
PETROBRAS 2003
Customer: PETROBRAS
Field / Site location: Repar Refinery - Curitiba, Brazil
Simulation Scope: OTS
Extension and customization of FCCsimulator developed for Replan Refinery:
Feed treatment
Reaction section
Separation section
Gas Recovery Unit
Control System: Emulation BAILEY INFI90
Comments / Benefits: Petrobras engineers are
customizing the HDT/HDS simulator from that delivered to Replan
Refinery using Delta V connection via OPC
Delivery date: 2003
BASF – YPC Company Limited 2003
Customer: BASF – YPC Company Limited
Field / Site location: New Integrated Petrochemical Site - Nanjing , Jiangsu province - East – Central China
Simulation Scope: 3 OTS
Ethylene Oxide / Ethylene Glycol
LDPE
Propionic Acid
Control System: Partial Stimulation of Emerson DeltaV DCS
Comments / Benefits: Provides a replica of the plant
behaviour that enables operators to be familiar with the processes and
their different phases such as normal start up, normal shut down,
emergency shut down.
Delivery date: 2003
AXENS / AXENS North America 2003
Customer: AXENS / AXENS North America
Field / Site location: Various refinery sites in USA,Chile, Japan, Korea, Hungary
Simulation Scope: POS
Prime G+ process licensed by Axens:
Selective Hydrogenation Unit
Deep Hydrodesulfurization with minimum octane loss
Control System: RSI SIMCON proprietary
Comments / Benefits: Advanced training tool for main process interactions. Evaluation of process options and carrying out of predictive simulations
Delivery date: 2003
Motiva Enterprise 2003
Customer: Motiva Enterprise
Field / Site location: USA
Simulation Scope: 3 OTS
Sulfur Recovery Unit
Control System: Honeywell TPS GUS (Link)
Comments / Benefits: Operator training
Delivery date: 2003
ANCAP 2002
Customer: ANCAP
Field / Site location: ANCAP refinery Montevideo, Uruguay
Simulation Scope: POS and OTS
Octanizing (Axens Licensed)- Regenerative Catalytic Reforming Unit
Control System: RSI SIMCON proprietary
Comments / Benefits: POS: helps users to take decisions regarding operation. OTS :
study of catalyst regeneration system - protection devices of the unit
-Identify and react to emergency and unsafe situations, etc.
Delivery date: 2002
Pemex 2002
Customer: Pemex
Field / Site location: Madero refinery, Mexico
Simulation Scope: OTS
Refining Units
Atmospheric Distillation Unit
Crude Oil distillation/Vacuum Distillation Unit
Delayed Coking
FCCU
Continuous Catalytic Reforming
Naphtha HDS
Claus Sulphur Unit (Claus Combustor™)
Sulfur Recovery
Control System: Siemens Teleperm XP and Honeywell (Link)
Comments / Benefits: Operator training
Delivery date: 2002
SINCOR 2001
Customer: SINCOR
Field / Site location: Jose Plant, Venezuela
Simulation Scope: OTS
Heavy Oil Upgrader
Atmospheric Distillation Unit
Vacuum Distillation Unit
Delayed Coking (Foster Wheeler)
Naphtha and Distillate Hydrotreater (Axens)
Mild Hydrodrocraking of Heavy Distillate Cuts (Axens)
Hydrogen Manufacturing Unit (Krupp Uhde)
Claus Sulphur Unit (Claus Combustor™)
Amine Units
Sour Water Stripping
Tail Gas Treating Unit (Resulf™)
Utilities
Control System: Partial Stimulation of Foxboro I/A Series using Foxboro's FSIM package
Comments / Benefits: Huge Simulator modelling the whole refinery complex.Use of the simulator for initial and periodic training of plant operators
Delivery date: 2001
GASCO 2000
Customer: GASCO
Field / Site location: Ruwais, Abu Dhabi, U.A.E
Simulation Scope: OTS
Debutaniser section
Debutaniser column
Debutaniser overhead drum with reflux and expedition pumps
Debutaniser reboiler pumps with fired furnace and six passes
Debutaniser bottom pumps and condensate exchangers
Control System: Partial Stimulation of Yokogawa CS3000 DCS
Comments / Benefits: The simulator is based on the
real control of the Process worked out by Yokogawa. Familiarising
operators with the Yokogawa CS3000 DCS.
Delivery date: 2000
TURKMENBASHI 1999
Customer: TURKMENBASHI
Field / Site location: Turkmenbashi Refinery, Turkmenistan
Simulation Scope: OTS
Continuous Catalytic Reformer (UOP)
Control System: Emulation Foxboro
Comments / Benefits: RSI SIMCON delivered 6 weeks training course on CCR simulator to prepare operators for Unit commissioning
Delivery date: 1999
PETROBRAS 1998
Customer: PETROBRAS
Field / Site location: Replan Refinery, Paulinia, Brazil
Simulation Scope:
OTS : Crude Oil Distillation Unit
OTS : FCC Unit (Kellogg Orthoflow design) : reaction and separation sections
OTS : HDT/HDS Unit
Modules: Desalter
Modules: Debutaniser
Modules: Atmospheric Column
Modules: Centrifugal Compressor
Modules: Furnace
Control System: Emulation FISHER SR90
Comments / Benefits: First simulators created with INDISS ™.The simulators are maintained by Petrobras engineers trained by RSI SIMCON engineers.
Delivery date: 1998
Copyright © RSI SIMCON, Dynamic Simulation Solutions.